Aurora Elementary School | Boulder CO
Aurora Elementary School in Boulder Colorado involved an approximately 16,000 SF addition to the existing structure, in four locations and various levels of remodeling throughout the existing structure.
There is a new fire sprinkler and new fire alarm throughout the existing building, ADA upgrades for interior and exterior of building.
Renovations to increase building security include a new main entrance that only allows access to main office and card readers to all other secondary access
Project Location
3995 E. Aurora Ave, Boulder CO 80303
Owner
Boulder Valley Public Schools
John Bollinger (303) 447-5113
Architect
Lantz-Boggio Architects
John Quest (303) 733-0436
W.O. Danielson Personnel
Tim Dillavou, PM
Leroy Rivale, Superintendent
More School Projects

Arapahoe Campus High School
Boulder CO
Arapahoe High School is located on 25 acres of Founders Village. Sod softball field with complete chain link fence enclosure, Breeze running track, sod football field, sod soccer field, and a tennis court with a chain link fence enclosure.

Douglas County Stadium #3
Parker CO
A district-wide stadium complex, located in the Parker area near Newlin Meadows. The 5,500 seat stadium has an artificial field for football, soccer, and lacrosse, home and visitor stands, locker rooms, and visitor facilities.

Mammoth Heights Elementary
Parker CO
A 73,146 SF school located on 10 acres in Parker CO, Stonegate subdivision. This two-story school utilizes high performance design, including block veneer, steel frame and a structural floor on spread footings.

Mesa Middle School #8
Castle Rock CO
A 132,414 SF middle school located on 22 acres in the Founders Village subdivision of Castle Rock. The school is two-story block veneer with steel frame structure and has a structural floor on drilled piers.

Rock Canyon High School
Highlands Ranch CO
The existing high school received a 28,000 SF F-Pod addition, including general classrooms as well as two additional science classrooms. Student parking was realigned to improve drop-off and pick-up safety and flow.